The creation of a new bespoke recycling plant.
- Project Completed For - Hills Group
- Main Contractor
- Completed 2020
- Project Total - £345,000
This included.
- Site loadings, design and verification.
- Panel boards and DNO connection works.
- HV transformer maintenance works includes oil change, fencing, repairs and painting.
- 4 x 1600 amp ACB panels with Power factor correction, surge protection and harmonic filters.
- Remote metering of all outgoing supplies from ACB panels.
- Substation works.
- Submains to new panel boards and distribution boards.
- High level containment with drops to production lines and distribution boards.
- External car park lighting.
- High level lighting design and installation.
- Emergency lighting design and installation.
- New commercial HGV garage installation.
- Small power distribution.
- Small power including office fitout, canteen and workshops etc.
- Production line power supplies.
- Air conditioning supplies.