The complete top to bottom fit out of a new bespoke production facility for an established customer.
- Project Completed For - Customer Direct Appointment
- Main Contractor
- Completed 2014
- Project Total - £225,000
This included.
- Site loadings, design and verification.
- Panel boards and DNO connection works.
- Submains to new distribution.
- High level containment with drops to production lines.
- Compactor power supplies.
- High level lighting design and installation.
- Emergency lighting design and installation.
- Small power distribution.
- Small power including office fitout, canteen and workshops etc.
- Production line power supplies.
- Air conditioning supplies.
- IT infrastructure.
- Relocation of machines from old site to new.