Our most recent PV installation was at Marlborough College, Wiltshire. The first step was to site survey calculate the return of the panels, check feed in tariffs and electrical return.  

The roof structure was checked to ensure it could cope with the weight of the 60 x 240 watt panels required. Next we assisted with obtaining planning permission from the local authority to ensure the installation could go ahead. The installation took two weeks from start to finish, including testing by MCS.